Internal Refurbishment
Back to ProjectsTHE CHALLENGE
To open up the lower ground floor spaces and install a bespoke metal spiral staircase linking all three floors. Our client and their family were able to live upstairs during the course of the works thanks to the temporary kitchen we provided. Other aspects of the work included installing a new bathroom and a Parquet floor with re-claimed blocks rescued from Hove bus station.