Considerate Building

The CHALLENGE: The major part of the project was to modify the existing second floor loft space by creating a new split level master bedroom and ensuite. Other works included restoring the front of the house back to its original brickwork and creating interior decorative details like wall panelling throughout the house. Our client managed the design process making it very easy for us to work together as a team.

Project:

Design:

Brick Restoration:

Location:

Internal and external house refurbishment

Anouska Naran, Considerate Building Ltd

Restore

Chiswick